These images are available for editorial use by news media.
Pictured here, Boeing mechanic Rob Thomas checks the 777s GE90-115B engines. Before these initiatives were implemented, Boeing conducted engine tests already completed by GE. After research and coordination with GE, the team reduced the overall test time by nearly 40 percent.
Neg. K65500